There is progress on two more bridge projects on the trails at the Edith L. Moore Nature Sanctuary. Bridge 12 has been replaced. Bridge 11 has been demolished down to the base logs.
Thanks to our hard working Tuesday Trail Crew pictured in the photo.
A section of the Creekside Loop trail near Bridge 11 is closed while construction is underway; signs have been posted.
Here are some photos of the recent work.
Bridge 11 demolished
New Bridge 12